Tule Wind Farm Hydroseeding

Client: Avangrid Renewables
Location: Boulevard, CA

American Hydroseed partnered with Hydrosprout to stabilize 32 acres of windmill pads with native seeding on a remote site in Boulevard, CA. With difficult water access, water was strategically supplied to a drop tank which then sourced two 4,000 gallon water trucks to provide water tendering us. This ensured little down time in filling for each load and kept us on schedule for this project which was operating under a time constraint.

  • 32

    ACRES

    hydroseeding

  • 64,000

    LBS

    wood fiber material

  • 192,000

    GALLONS

    water